Charmack
Investments Inc.
Think Inside The Box
Recent Projects
Automotive Dealership, Barbados
This project consisted of 8 interconnected modules forming a structure approximately 16 feet wide by 80 feet long. Inside consisted of office space, reception space, toilets, lunch room and parts department. The basic structure was assembled in 3 days and completed in 2 weeks.
Banks Breweries, Barbados
This project consisted of 8 interconnected modules forming a structure 80 feet long by 16 feet wide. It consisted of a mix of male and female toilets and showers, urinals as well as locker space.
Photovoltaic Support Structure, Barbados
To support the photovoltaic panels above a car park, PTH Caribbean supplied and installed this hot dipped galvanized steel structure over the car park.
Automotive Dealership, Trinidad
This project consisted of 5 interconnected modules forming a structure approximately 8 feet wide by 80 feet long. Inside consisted of office space, reception space, toilets, lunch room and parts department. The basic structure was assembled in just two days.
Dreadhop Brewing, Barbados
This project provided office space, male and female toilets as well as a lunch room for a craft brewery located in Barbados. The structure was assembled and erected inside the plant and consisted of the toilets and lunch room on ground level and then the office space on the 1st floor.
6,000 sqft Warehouse Structure, Barbados
This project involved the supply and installation of an approximately 6,000 sqft hot dipped galvanized steel warehouse building.